banner

Products

Yx71-478 Roll Forming Machine for Boltless Roof

Yx71-478 Roll Forming Machine for Boltless Roof

1.The Chart of Process FlowProfile: 2.Technical ParametersThe main technical parameters are for your inference only. Onl
SHARE

Description

Basic Info
Model NO. YX71-478 Roll former for boltless roof
Thickness 0.4-0.6mm
Overall Dimensions 7180*1550*1650mm
Payment Terms 30%T/T Deposit, 70%T/T or L/C Balance
Transport Package 40gp′*1
Specification 6T
Trademark LIMING MACHINERY
Origin Fujian, China (Mainland)
Production Capacity 600
Product Description
1.The Chart of Process FlowProfile:

Yx71-478 Roll Forming Machine for Boltless Roof


2.Technical ParametersThe main technical parameters are for your inference only. Only if you provide the profile required or the real objects of sectional materials, and we will offer the accurate parameters.
(1) 3Tons un-coiler
Description There are different choices, please turn to the catalogue of un-coiler
(2) The general machine parameter
Suitable roll forming material Color steel sheet or galvanized steel sheet
Thickness0.4mm-0.6mm
Feeding width600mm
Frame designWall-plate-frame-design /New-stand-frame-design
Roll stages16 stages
Material of forming roller45# steel, CNC lathes, Hard Chrome Coated
Shafts DiameterΦ75mm
Main motor power7.5KW with reducer
Max. Line speed of roll former 15m/min (Higher speed is available, depends on the specification required by the buyer)
Hydraulic group power4KW
Material of cutting bladeCr12, hear treatment
Electric Standard380V /50Hz/3PH or as the customer's requirements
Machine Dimensions 7180mm×1550mm×1650mm
Major Color of Machine PaintedRAL 5015 (Blue) or as per customer's requirements
Electric Seaming MachineOne unit
Hand Seaming PincersTwo units
(3) PLC Control system
PLCSiemens brand (ABB brand is available if required)
Touch ScreenSiemens brand (ABB brand is available if required)
InverterSchneider brand (ABB brand is available if required)
Encoder Omron brand
(4) Product rack
Descriptionun-powered, 3 units
(6) Option:
  1. Embossing
  2. Pre-punching & Pre-notching device
  3. Gluing machine
  4. 40GP/HQ container and Disposal inside for standing seam machine
Pl refer to the attached pictures for details
(6) Service after sell
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.Installation:(1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.(2) If installation is needed, the buyer shall make the following preparation before arrival of technicians.a) Position the machine in the buyer's factory.b) Prepare necessary electric wiring.c) Prepare material of trial running.d) Provide labors for assistance and installation during installation.e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly.
(7) About us
Please visit the web site: liming2018.en.made-in-china.com for detailed information

Below pictures are for your reference only

Yx71-478 Roll Forming Machine for Boltless Roof


Yx71-478 Roll Forming Machine for Boltless Roof

After-Sale Service

In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.

Installation:If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the buyer shall make the following preparation before arrival of technicians.

Terms Of Trade

Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.

Our Contact